Conoscenza di base
How to manage project items efficiently
Imagine you have to check one joint in a complex way. How will you do it?
With proper use of Project items manager, you can model it only once, Copy it and run another analysis on the same model or try the different designs of the connection.
For example, you have four items in one file, each item for a different type of analysis: EPS - Stress/Strain, ST - Stiffness analysis, CD - Capacity Design, DR - Joint design resistance.
Project items manager is also accessible from the top ribbon - you can easily create a new item, copy the actual one or switch between.